About
The Fairford Acrylic L Shape Side Panel, measuring 1700mm, is designed for modern L-shaped baths, offering both aesthetic and functional benefits. Made from high-quality acrylic, it features a durable 3mm thickness and a glossy white finish, ensuring a timeless look that fits well with any bathroom style. The dimensions are tailored to frame the bath perfectly, providing a seamless appearance.
Installation is straightforward, as the panel comes with all necessary fixings, making it an excellent choice for bathroom renovations or upgrades. The snug fit and non-adjustable height enhance the overall design, adding a minimalist touch to the space. With a 5-year guarantee, this panel is engineered for longevity and convenience, making it a practical addition to your home.
Features
- Elevates the aesthetic and functionality of the bathroom
- Crafted from high-quality acrylic for durability and lightweight design
- Robust 3mm panel thickness for long-lasting durability
- Gloss white finish for a pristine, timeless look
- Tailored to perfectly frame L-shaped baths
- Complete with necessary fixings for straightforward installation
- Unmatched versatility and convenience
- Designed for a snug fit and clean finish
- Non-adjustable height for a streamlined, minimalist design
- Exceptional value as part of the Green discount group
Specifications
- Length: 1500mm
- Guarantee: 5 Year
- Material: Acrylic
- Adjustable Height: No
- Colour: Gloss White
- Contains: Bath panel and fixings
- Panel Thickness: 3mm
- Suits Bath Types: L Shape Baths
- Discount Group: Green
- Bath Panel Length: 1700mm
What are the delivery charges?
- Orders over £250 receive FREE standard delivery to mainland UK
- Order under £250 will incur a £15 carriage charge
How soon will my order be delivered?
- For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
- Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout
Can I collect my order
Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire. We will require a 24 hour lead time from the date of order
Can I return my order?
If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.
If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.
Visit our returns page for full returns information
What happens if my product is damaged?
Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.
Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.
Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.
Fairford Acrylic L Shape Side Panel, 1700mm
Fairford Acrylic L Shape Side Panel, 1700mm
SKU: 14140101 Manufacturer: Fairford
In stock. Delivery from Jun 26th.
Couldn't load pickup availability
-
Free Delivery
Free UK Mainland delivery for any order under £250
-
30 Day Free Returns
Return this product, at no cost, for up to 30 days after delivery!
-
5 Year Guarantee
Backed by a comprehensive guarantee
About
The Fairford Acrylic L Shape Side Panel, measuring 1700mm, is designed for modern L-shaped baths, offering both aesthetic and functional benefits. Made from high-quality acrylic, it features a durable 3mm thickness and a glossy white finish, ensuring a timeless look that fits well with any bathroom style. The dimensions are tailored to frame the bath perfectly, providing a seamless appearance.
Installation is straightforward, as the panel comes with all necessary fixings, making it an excellent choice for bathroom renovations or upgrades. The snug fit and non-adjustable height enhance the overall design, adding a minimalist touch to the space. With a 5-year guarantee, this panel is engineered for longevity and convenience, making it a practical addition to your home.
Features
- Elevates the aesthetic and functionality of the bathroom
- Crafted from high-quality acrylic for durability and lightweight design
- Robust 3mm panel thickness for long-lasting durability
- Gloss white finish for a pristine, timeless look
- Tailored to perfectly frame L-shaped baths
- Complete with necessary fixings for straightforward installation
- Unmatched versatility and convenience
- Designed for a snug fit and clean finish
- Non-adjustable height for a streamlined, minimalist design
- Exceptional value as part of the Green discount group
Specifications
- Length: 1500mm
- Guarantee: 5 Year
- Material: Acrylic
- Adjustable Height: No
- Colour: Gloss White
- Contains: Bath panel and fixings
- Panel Thickness: 3mm
- Suits Bath Types: L Shape Baths
- Discount Group: Green
- Bath Panel Length: 1700mm
What are the delivery charges?
- Orders over £250 receive FREE standard delivery to mainland UK
- Order under £250 will incur a £15 carriage charge
How soon will my order be delivered?
- For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
- Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout
Can I collect my order
Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire. We will require a 24 hour lead time from the date of order
Can I return my order?
If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.
If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.
Visit our returns page for full returns information
What happens if my product is damaged?
Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.
Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.
Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.
