About
The Fairford 1700 x 850mm RH L Shape Bath with Screen and Panel features a spacious L-shape design that maximises comfort and practicality in your bathroom. The right-hand shower bath set includes a reinforced base layer, ensuring durability and long-term stability under foot. The 6mm easy-clean screen helps keep splashes contained while its surface resists grime and makes maintenance simpler.
Included with the Fairford bath set are the bath itself, bath panel, bath waste and the bath screen - everything needed for a complete installation. The reinforced base adds to the overall strength, while the panel and waste are designed to integrate seamlessly for a clean, cohesive look. With a generous size of 1700mm by 850mm, it provides both depth and width for bathing or showering.
A five-year manufacturer guarantee offers peace of mind, reflecting the confidence in build quality and materials. The Fairford 1700 x 850mm RH L Shape Bath with Screen and Panel is designed to combine form, function and ease of care in one carefully crafted bath set.
Product Features
- Right-hand L-shaped bath set combining bathing and showering in one unit
- Includes 6 mm easy-clean bath screen for splash protection
- Comes with bath panel and waste as part of the complete pack
- Reinforced base layer for enhanced strength and durability
- L-shape design provides wider area for showering, comfort for soaking
- Five-year manufacturer's guarantee for peace of mind
| Type | Shower Baths |
|---|---|
| Length | 1700 mm |
| Width | 850 mm |
| Orientation | Right Hand configuration |
| Includes | Bath, waste, bath screen, and bath panel |
| Guarantee | 5 years |
What are the delivery charges?
- Orders over £250 receive FREE standard delivery to mainland UK
- Order under £250 will incur a £15 carriage charge
How soon will my order be delivered?
- For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
- Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout
Can I collect my order
Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire. We will require a 24 hour lead time from the date of order
Can I return my order?
If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.
If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.
Visit our returns page for full returns information
What happens if my product is damaged?
Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.
Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.
Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.
Fairford 1700 x 850mm RH L Shape Bath with Screen and Panel
Fairford 1700 x 850mm RH L Shape Bath with Screen and Panel
SKU: 14141006 Manufacturer: Stonewater Bathrooms
In stock. Delivery from Aug 13th.
-
Free Delivery
Free UK Mainland delivery for any order under £250
-
30 Day Free Returns
Return this product, at no cost, for up to 30 days after delivery!
-
5 Year Guarantee
Backed by a comprehensive guarantee
About
The Fairford 1700 x 850mm RH L Shape Bath with Screen and Panel features a spacious L-shape design that maximises comfort and practicality in your bathroom. The right-hand shower bath set includes a reinforced base layer, ensuring durability and long-term stability under foot. The 6mm easy-clean screen helps keep splashes contained while its surface resists grime and makes maintenance simpler.
Included with the Fairford bath set are the bath itself, bath panel, bath waste and the bath screen - everything needed for a complete installation. The reinforced base adds to the overall strength, while the panel and waste are designed to integrate seamlessly for a clean, cohesive look. With a generous size of 1700mm by 850mm, it provides both depth and width for bathing or showering.
A five-year manufacturer guarantee offers peace of mind, reflecting the confidence in build quality and materials. The Fairford 1700 x 850mm RH L Shape Bath with Screen and Panel is designed to combine form, function and ease of care in one carefully crafted bath set.
Product Features
- Right-hand L-shaped bath set combining bathing and showering in one unit
- Includes 6 mm easy-clean bath screen for splash protection
- Comes with bath panel and waste as part of the complete pack
- Reinforced base layer for enhanced strength and durability
- L-shape design provides wider area for showering, comfort for soaking
- Five-year manufacturer's guarantee for peace of mind
| Type | Shower Baths |
|---|---|
| Length | 1700 mm |
| Width | 850 mm |
| Orientation | Right Hand configuration |
| Includes | Bath, waste, bath screen, and bath panel |
| Guarantee | 5 years |
What are the delivery charges?
- Orders over £250 receive FREE standard delivery to mainland UK
- Order under £250 will incur a £15 carriage charge
How soon will my order be delivered?
- For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
- Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout
Can I collect my order
Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire. We will require a 24 hour lead time from the date of order
Can I return my order?
If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.
If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.
Visit our returns page for full returns information
What happens if my product is damaged?
Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.
Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.
Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.
