Skip to product information
1 of 4

Fairford 1700 x 850mm LH L Shape Bath with Screen and Panel

Fairford 1700 x 850mm LH L Shape Bath with Screen and Panel

SKU: 14141005 Manufacturer: Stonewater Bathrooms

In stock. Delivery from Aug 13th.

Regular price £695.00
Regular price Sale price £695.00
Inc VAT
  • Free Delivery

    Free UK Mainland delivery for any order under £250

  • 30 Day Free Returns

    Return this product, at no cost, for up to 30 days after delivery!

  • 5 Year Guarantee

    Backed by a comprehensive guarantee

About

The Fairford 1700 x 850mm LH L Shape Bath with Screen and Panel is a complete left hand shower bath set designed for comfort and practicality. Featuring an L shape design, it offers generous bathing space with one side longer than the other, ideal for smaller bathrooms or when positioning is important. Its reinforced base layer ensures long-term durability and prevents sagging, giving reliable support for daily use.

Included in this set are the bath itself, a matching waste, a bath panel, and a 6mm easy clean screen. The screen's thickness provides solid protection against water splashes, while its easy clean surface makes maintenance straightforward and quick. The bath panel fits seamlessly, creating a clean, integrated look.

This set comes with a reassuring 5 year manufacturers guarantee, underscoring its quality and durability. For those seeking a practical, stylish solution without compromise, this left hand L shape bath set delivers function and peace of mind in equal measure.

Product Features

  • Left-hand L-shape shower bath set for versatile installation
  • Includes bath, waste, bath screen and bath panel for a complete setup
  • Reinforced base layer enhances strength and reduces flex
  • 6 mm toughened, easy-clean glass screen for durability and low maintenance
  • 5-year manufacturer's guarantee for assured quality
  • Comfortable internal bathing space with spacious design
Type Shower Baths
Length 1700 mm
Width 850 mm
Thickness 6 mm
Orientation Left Hand configuration
Style L-shape shower bath
Includes Bath, panel, screen, waste Glass screen

What are the delivery charges?

  • Orders over £250 receive FREE standard delivery to mainland UK
  • Order under £250 will incur a £15 carriage charge

How soon will my order be delivered?

  • For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
  • Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout

Can I collect my order

Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire.  We will require a 24 hour lead time from the date of order

Can I return my order?

If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.

If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.

Visit our returns page for full returns information

What happens if my product is damaged?

Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.

Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.

Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.

View full details