Skip to product information
1 of 4

Fairford 1600 x 850mm RH L Shape Bath with Screen and Panel

Fairford 1600 x 850mm RH L Shape Bath with Screen and Panel

SKU: 14141004 Manufacturer: Stonewater Bathrooms

In stock. Delivery from Aug 13th.

Regular price £695.00
Regular price Sale price £695.00
Inc VAT
  • Free Delivery

    Free UK Mainland delivery for any order under £250

  • 30 Day Free Returns

    Return this product, at no cost, for up to 30 days after delivery!

  • 5 Year Guarantee

    Backed by a comprehensive guarantee

About

The Fairford 1600 x 850mm RH L Shape Bath with Screen and Panel delivers a practical solution for modern bathrooms, combining generous bathing area with space-saving design. This is a right hand shower bath set that includes bath, waste, bath screen and bath panel, ensuring you have all essential components in one pack. Built with a reinforced base layer for added strength and stability, so it stands up to daily use without sagging or noise.

The L shape design is ideal for ease of use, allowing a shower and bath in one unit without compromising comfort. The 6 mm easy-clean screen is included to simplify cleaning and help reduce water splash, keeping the bathroom cleaner with minimal effort. With dimensions of 1600 mm by 850 mm, this setup fits many layouts while offering ample space.

This product carries a five-year guarantee, giving assurance in its durability and build quality. Whether replacing an existing bath or installing a new feature, this setup offers reliability, convenience and value in equal measure.

Product Features

  • Right-hand L-shape shower bath set, designed to combine bathing and showering in one space-efficient solution
  • Comes with a reinforced base layer for enhanced strength and stability
  • Includes 6 mm easy-clean screen to reduce water splash and simplify maintenance
  • Pack contains bath, matching panel, waste, and bath screen - everything needed for a full installation
  • 5-year manufacturer's guarantee offering peace of mind
  • Crisp white finish to fit a variety of bathroom decors
Type Shower Baths
Length 1600 mm
Width 850 mm
Orientation Right-hand (RH)
Guarantee 5 years

What are the delivery charges?

  • Orders over £250 receive FREE standard delivery to mainland UK
  • Order under £250 will incur a £15 carriage charge

How soon will my order be delivered?

  • For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
  • Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout

Can I collect my order

Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire.  We will require a 24 hour lead time from the date of order

Can I return my order?

If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.

If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.

Visit our returns page for full returns information

What happens if my product is damaged?

Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.

Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.

Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.

View full details