Skip to product information
1 of 4

Fairford 1600 x 850mm LH L Shape Bath with Screen and Panel

Fairford 1600 x 850mm LH L Shape Bath with Screen and Panel

SKU: 14141003 Manufacturer: Stonewater Bathrooms

In stock. Delivery from Aug 13th.

Regular price £695.00
Regular price Sale price £695.00
Inc VAT
  • Free Delivery

    Free UK Mainland delivery for any order under £250

  • 30 Day Free Returns

    Return this product, at no cost, for up to 30 days after delivery!

  • 5 Year Guarantee

    Backed by a comprehensive guarantee

About

The Fairford 1600 x 850mm LH L Shape Bath with Screen and Panel offers a spacious and practical bathing solution with its left-hand L-shape design that maximises usable space. At 1600mm by 850mm, it provides ample room for a comfortable shower and soak combination. This product includes a reinforced base layer that ensures long-term stability and durability, giving users confidence in its structure and support.

A 6mm easy-clean screen is included, simplifying maintenance and keeping the enclosure looking clean with minimal effort. The bath panel and waste are supplied as part of the complete set, so there's no need to source additional components. This streamlines installation and ensures all pieces work seamlessly together.

Backed by a 5-year manufacturers guarantee, this product combines performance with peace of mind, offering both quality and value. Ideal for bathrooms where efficiency meets style, it makes an excellent choice for those seeking functionality without compromise.

Product Features

  • 1600 × 850 mm Left-Hand L-Shape shower bath set
  • Reinforced base layer for added strength and durability
  • 6 mm Easy-Clean screen included for splash protection
  • Bath panel supplied to complete the look
  • 5-year manufacturer's guarantee for peace of mind
  • Components included: bath, screen, panel, and waste fitting

Product Specifications

  • Length: 1600 mm
  • Width (at widest point): 850 mm
  • Handing: Left-Hand (LH) configuration
  • L-Shape design to facilitate both bathing and showering use
  • Bath screen thickness: 6 mm toughened glass
  • Panel type: front/bath panel matching bath set
  • Base: reinforced layer to prevent flex and improve stability
  • Guarantee duration: 5 years from date of manufacture
  • Pack contents: bath, bath screen, bath panel, and waste included

What are the delivery charges?

  • Orders over £250 receive FREE standard delivery to mainland UK
  • Order under £250 will incur a £15 carriage charge

How soon will my order be delivered?

  • For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
  • Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout

Can I collect my order

Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire.  We will require a 24 hour lead time from the date of order

Can I return my order?

If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.

If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.

Visit our returns page for full returns information

What happens if my product is damaged?

Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.

Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.

Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.

View full details