About
The Fairford 1600 x 850mm L Shaped Right Hand Shower Bath is designed for modern, space-efficient bathing, combining style and functionality. Made from durable sanitary-grade acrylic, it features a sleek square shape that fits various bathroom layouts, providing ample space for both soaking and showering with a 235-litre capacity. The right-handed orientation enhances usability, while the easy-to-clean surface ensures long-lasting maintenance.
With its crisp white finish, this shower bath offers a timeless addition to any decor. The lack of pre-drilled tap holes allows for custom fittings, and the package includes a sturdy leg set for straightforward installation, though bath panels are sold separately.
Backed by a 5-year guarantee, the Fairford L Shaped Shower Bath is a reliable option for transforming any bathroom space, merging sophistication with practicality.
Features
- Stylish and functional design
- space-efficient L-shaped configuration
- Crafted from Durable sanitary-grade acrylic
- Easy-to-clean surface
- Ample space for comfortable soaking or refreshing shower
- right-handed orientation
- Sleek square shape for contemporary aesthetics
- crisp white finish adds elegance
- customizable fittings with No pre-drilled tap holes
- Includes bath and sturdy leg set for installation
- 5-Year guarantee for peace of mind
| Type | Baths |
|---|---|
| Length | 1600mm |
| Width | 850mm |
| Shape | Square |
| Material | Sanitary grade acrylic |
| Colour | White |
| Thickness | 4mm |
| Orientation | Right Handed |
| Overflow | 235L |
| Style | L Shape Shower Bath |
| Bath Size | 1800 x 800mm Bath |
| Guarantee | 5 Year |
What are the delivery charges?
- Orders over £250 receive FREE standard delivery to mainland UK
- Order under £250 will incur a £15 carriage charge
How soon will my order be delivered?
- For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
- Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout
Can I collect my order
Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire. We will require a 24 hour lead time from the date of order
Can I return my order?
If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.
If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.
Visit our returns page for full returns information
What happens if my product is damaged?
Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.
Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.
Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.
Fairford 1600 x 850mm L Shaped Right Hand Shower Bath
Fairford 1600 x 850mm L Shaped Right Hand Shower Bath
SKU: 14140348 Manufacturer: Fairford
In stock. Delivery from Aug 21st.
-
Free Delivery
Free UK Mainland delivery for any order under £250
-
30 Day Free Returns
Return this product, at no cost, for up to 30 days after delivery!
-
5 Year Guarantee
Backed by a comprehensive guarantee
About
The Fairford 1600 x 850mm L Shaped Right Hand Shower Bath is designed for modern, space-efficient bathing, combining style and functionality. Made from durable sanitary-grade acrylic, it features a sleek square shape that fits various bathroom layouts, providing ample space for both soaking and showering with a 235-litre capacity. The right-handed orientation enhances usability, while the easy-to-clean surface ensures long-lasting maintenance.
With its crisp white finish, this shower bath offers a timeless addition to any decor. The lack of pre-drilled tap holes allows for custom fittings, and the package includes a sturdy leg set for straightforward installation, though bath panels are sold separately.
Backed by a 5-year guarantee, the Fairford L Shaped Shower Bath is a reliable option for transforming any bathroom space, merging sophistication with practicality.
Features
- Stylish and functional design
- space-efficient L-shaped configuration
- Crafted from Durable sanitary-grade acrylic
- Easy-to-clean surface
- Ample space for comfortable soaking or refreshing shower
- right-handed orientation
- Sleek square shape for contemporary aesthetics
- crisp white finish adds elegance
- customizable fittings with No pre-drilled tap holes
- Includes bath and sturdy leg set for installation
- 5-Year guarantee for peace of mind
| Type | Baths |
|---|---|
| Length | 1600mm |
| Width | 850mm |
| Shape | Square |
| Material | Sanitary grade acrylic |
| Colour | White |
| Thickness | 4mm |
| Orientation | Right Handed |
| Overflow | 235L |
| Style | L Shape Shower Bath |
| Bath Size | 1800 x 800mm Bath |
| Guarantee | 5 Year |
What are the delivery charges?
- Orders over £250 receive FREE standard delivery to mainland UK
- Order under £250 will incur a £15 carriage charge
How soon will my order be delivered?
- For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
- Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout
Can I collect my order
Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire. We will require a 24 hour lead time from the date of order
Can I return my order?
If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.
If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.
Visit our returns page for full returns information
What happens if my product is damaged?
Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.
Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.
Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.
