About
The Fairford 1600 x 850mm L Shaped Left Hand Shower Bath is a practical addition to modern bathrooms, offering a blend of style and functionality. Its L-shaped design combines a spacious shower area with a comfortable bathing space, making it suitable for compact settings. Constructed from durable sanitary grade acrylic with a 4mm thickness, this bath ensures longevity while remaining lightweight. Its 235-litre capacity offers ample room for a relaxing soak, complemented by a sleek white finish that fits various decors.
Measuring 1600mm in length and 850mm in width, the bath accommodates small spaces without sacrificing comfort. It features a customizable design without pre-drilled tap holes, allowing for personalized tap placement. The package includes a sturdy legset for secure installation, with bath panels available separately. The product is backed by a 5-year guarantee for reassurance in quality.
Features
- Transform your bathroom into a modern sanctuary
- Combines style, functionality, and durability
- Enhances bathing experience while maximizing space efficiency
- Unique L-shaped profile blends spacious shower area with relaxing bath
- Crafted from high-quality sanitary grade acrylic for exceptional durability
- 4mm thickness for added strength and longevity
- Pristine white finish complements any bathroom decor
- Generous capacity of 235 litres to the overflow
- Ideal for compact bathrooms without compromising comfort
- Square-shaped design adds modern elegance
- Flexibility to customize tap placement (no pre-drilled tap holes)
- Package includes bath and a sturdy legset for secure installation
- Backed by a 5-year guarantee for peace of mind
| Type | Baths |
|---|---|
| Length | 1600mm |
| Width | 850mm |
| Shape | Square |
| Colour | White |
| Tap Holes | None |
| Thickness | 4mm |
| Orientation | Left Handed |
| Overflow | 235L |
| Style | L Shape Shower Bath |
| Includes | Bath, legset |
| Bath Size | 1800 x 800mm |
| Guarantee | 5 Year |
What are the delivery charges?
- Orders over £250 receive FREE standard delivery to mainland UK
- Order under £250 will incur a £15 carriage charge
How soon will my order be delivered?
- For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
- Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout
Can I collect my order
Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire. We will require a 24 hour lead time from the date of order
Can I return my order?
If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.
If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.
Visit our returns page for full returns information
What happens if my product is damaged?
Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.
Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.
Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.
Fairford 1600 x 850mm L Shaped Left Hand Shower Bath
Fairford 1600 x 850mm L Shaped Left Hand Shower Bath
SKU: 14140347 Manufacturer: Fairford
In stock. Delivery from Aug 23rd.
-
Free Delivery
Free UK Mainland delivery for any order under £250
-
30 Day Free Returns
Return this product, at no cost, for up to 30 days after delivery!
-
5 Year Guarantee
Backed by a comprehensive guarantee
About
The Fairford 1600 x 850mm L Shaped Left Hand Shower Bath is a practical addition to modern bathrooms, offering a blend of style and functionality. Its L-shaped design combines a spacious shower area with a comfortable bathing space, making it suitable for compact settings. Constructed from durable sanitary grade acrylic with a 4mm thickness, this bath ensures longevity while remaining lightweight. Its 235-litre capacity offers ample room for a relaxing soak, complemented by a sleek white finish that fits various decors.
Measuring 1600mm in length and 850mm in width, the bath accommodates small spaces without sacrificing comfort. It features a customizable design without pre-drilled tap holes, allowing for personalized tap placement. The package includes a sturdy legset for secure installation, with bath panels available separately. The product is backed by a 5-year guarantee for reassurance in quality.
Features
- Transform your bathroom into a modern sanctuary
- Combines style, functionality, and durability
- Enhances bathing experience while maximizing space efficiency
- Unique L-shaped profile blends spacious shower area with relaxing bath
- Crafted from high-quality sanitary grade acrylic for exceptional durability
- 4mm thickness for added strength and longevity
- Pristine white finish complements any bathroom decor
- Generous capacity of 235 litres to the overflow
- Ideal for compact bathrooms without compromising comfort
- Square-shaped design adds modern elegance
- Flexibility to customize tap placement (no pre-drilled tap holes)
- Package includes bath and a sturdy legset for secure installation
- Backed by a 5-year guarantee for peace of mind
| Type | Baths |
|---|---|
| Length | 1600mm |
| Width | 850mm |
| Shape | Square |
| Colour | White |
| Tap Holes | None |
| Thickness | 4mm |
| Orientation | Left Handed |
| Overflow | 235L |
| Style | L Shape Shower Bath |
| Includes | Bath, legset |
| Bath Size | 1800 x 800mm |
| Guarantee | 5 Year |
What are the delivery charges?
- Orders over £250 receive FREE standard delivery to mainland UK
- Order under £250 will incur a £15 carriage charge
How soon will my order be delivered?
- For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
- Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout
Can I collect my order
Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire. We will require a 24 hour lead time from the date of order
Can I return my order?
If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.
If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.
Visit our returns page for full returns information
What happens if my product is damaged?
Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.
Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.
Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.
