Skip to product information
1 of 4

Fairford 1500 x 850mm RH L Shape Bath with Screen and Panel

Fairford 1500 x 850mm RH L Shape Bath with Screen and Panel

SKU: 14141002 Manufacturer: Stonewater Bathrooms

In stock. Delivery from Aug 13th.

Regular price £695.00
Regular price Sale price £695.00
Inc VAT
  • Free Delivery

    Free UK Mainland delivery for any order under £250

  • 30 Day Free Returns

    Return this product, at no cost, for up to 30 days after delivery!

  • 5 Year Guarantee

    Backed by a comprehensive guarantee

About

The Fairford 1500 x 850mm RH L Shape Bath with Screen and Panel delivers a practical solution for modern bathroom layouts. Featuring a right hand L-shape design, this bath set combines spacious bathing and a comfortable showering experience. With a reinforced base layer, it's built for long-lasting stability while supporting daily use.

Included in the pack are the bath itself, a bath panel, a 6mm easy-clean screen, and a waste - everything you need for a clean, coordinated look. The easy-clean screen helps reduce limescale buildup and simplifies maintenance; the bath panel ensures a sleek finish that conceals plumbing while matching the bath's contours.

Backed by a 5-year guarantee, this bath set offers peace of mind and demonstrates confidence in its durability. Whether you're renovating or upgrading, this set delivers both functionality and refined style for your bathroom.

Product Features

  • Right-hand L-shape shower bath set combining a spacious bath and shower space
  • Reinforced base layer for added strength and stability
  • 6 mm easy-clean screen included for superior water containment and low maintenance
  • Includes bath, waste fitting, screen, and front panel for a complete setup
  • Clean-white finish and gloss surface for a bright, modern look
  • No pre-drilled tap holes - allows you to position taps deck- or wall-mounted to suit your layout
  • 5-year manufacturer's guarantee for peace of mind in durability and build quality
Type Shower Baths
Length 1500 mm
Orientation Right-hand sided shower section
Style L-shape shower bath
Guarantee 5 years

What are the delivery charges?

  • Orders over £250 receive FREE standard delivery to mainland UK
  • Order under £250 will incur a £15 carriage charge

How soon will my order be delivered?

  • For all products marked as “In Stock” we offer delivery on the day noted beside the product or the ability to select any day after that
  • Delivery information for each product will be displayed on the product page, as well as in the basket and the checkout

Can I collect my order

Yes, you can collect your order from our main distribution warehouse in Andover, Hampshire.  We will require a 24 hour lead time from the date of order

Can I return my order?

If you’re not happy with your purchase, for any reason, we will offer you a full refund within the first 21 days. Anything with a value under £70 will be subject to a transportation charge. This will be subject to the product & packaging being in a resaleable condition.

If you need to return your products outside of the 21-day period you will need to contact us on 02380 769 112 or email and request a returns form.

Visit our returns page for full returns information

What happens if my product is damaged?

Whilst all our products pass strict quality standards and our ceramic products are shipped via a white glove delivery service, on very rare occasions you may find an item arrives damaged.

Please make sure you take time to inspect your goods as soon as you receive them and let us know within 48 hours of receipt if an item is damaged. Please send photos on a WhatsApp message to our customer service
number 07592 133270 or an email to your account manager. Once the damage has been confirmed, we’ll ensure its replaced free of charge immediately.

Photos will be required to confirm damage. These are required prior to installation as no refund or replacement can be arrange once the goods have been installed.

View full details